![]() The City of Tulsa has contracted with Earth Smart Construction for this $488,441.80 project funded through the stormwater utility fee. This involves repairing erosion, backfilling, grading, and establishing solid sod through watering and fertilizing.Multiple trees have been identified for removal or canopy raising to allow sunlight to reach ground vegetation.This system is maintenance-friendly and allows for the electric components to be located outside the pond.The diffusers are specifically sized for the pond and assist with oxygen transfer and water movement, resulting in an overall healthier pond.The existing fountain aerators will be replaced with a diffuser style system.This will improve water quality and create a healthier pond.The pond bottom will be reestablished to its historic state by removing muck and vegetative buildup, resulting in an average depth of 8 feet.This project consists of the following work: Though these streets will remain open, users should watch for large vehicles entering and exiting the park. Completion of the project is anticipated in late June.ĭuring the project, part of the park will be closed, including the pond and an area between West Edison Street and West Easton Place, along North Quanah Avenue. Maybelle Ave., is scheduled to begin during the week of March 13. SRS Offers the Following A New Pond Service How We Do It Remove Bottom Sediments From Your Pond Every pond is in a dying process the moment it is created. ![]() A rehabilitation project at the pond in Owen Park, 560 N. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |